955 Bannock

955 Bannock

Exceed was tasked with installing a 3000A main distribution board and 175A service lateral to the 400A fire pump controller at a 12-story, 98-unit high-rise building located in Denver at the intersection of Bannock St. and Speer Blvd. Additionally, we set up a 500KW...